What should be noted when the magnetic separator is turned on and off?

What should be noted when opening and stopping the magnetic separator and operating it?

(1) Before driving, pay attention to check the power line, transmission, lubrication system and equipment around the situation, confirm the normal, can drive after the obstacles;

(2) The driving of the equipment shall be carried out in a certain order. Generally speaking, driving is carried out from the back to the front according to the process, and parking is reversed;

(3) When driving, first open the water pipes of each part of the equipment, the discharge port should start smaller, then feed the mine, and gradually adjust to normal operation;

(4) When all equipment is parked, contact the pump management personnel first, then stop the mine, and gradually close the water gate and the discharge port. If the water gate is closed without contact, the pump may collapse. Local parking should also be contacted in advance to determine the number of pump starts.

The operation of the magnetic separation process is to minimize the tailings grade under the premise of ensuring the quality of the concentrate. To this end, the operator must be "two diligence" and "two quasi". "Second Qin" is a diligent inspection and diligent contact. Diligent inspection is in the production process, the nature of the original ore, the concentration of the grinding, the color of the pulp, the quality of the product, and the condition of the water and equipment are normal, so that you can find out the problem in a timely manner. Always contact each other between the upper and lower processes, communicate the situation, and be proud of mastering the overall process of the festival. "Second standard" is an accurate judgment, and the heap is adjusted. That is to say, on the basis of “two Qin”, accurately determine the changes in ore properties and other process factors, and timely and accurately adjust the process.

Braid High Pressure Piping

we are OEM tubing pipeline factory ,we could produing what you need ,for car use ,waiting for your request in anytime.
We Can provide customers with customized services

  • Free samples is ok
  • The quality inspection department must inspect every product and every process before export
  • Resolutely put an end to the delivery of substandard products
  • Producing Nylon pipeline products for 20 years
  • Our Technological process have Extrude Cutting Forming Assembly Detect
  • We cooperate with many universities to carry out research and development
  • Ourcompany has passenger and commercial vehicle pipeline parts production and development capacity
  • The quality inspection department must inspect every product and every process before export
  • Resolutely put an end to the delivery of substandard products

Polyamide brake tube,PA corrugated tube, Automobile wire tube

Changchun FAW Sihuan Automobile Pipe Co,Ltd , https://www.fpcpfuelpipe.com