Plastic Vegetable Baskets Injection Mould

Model NO.: RMMOULD11665
Runner: Single/Multi
Design Software: UG
Installation: Fixed
Standard: HASCO
Customized: Customized
Name: Plastic Vegetable Baskets Injection Mould
Design Day: 3 Days
Cavity: Single/Multi
Deliery: by Sea
Mould Material: 45#, 50#, P20, H13, 718, 2738, Nak80, S136, SKD61
Polish: Mirrior Polish
Trademark: REMO
Transport Package: Wooden Case
Specification: International Standard
Origin: Taizhou China
HS Code: 8480719090
Plastic baskets mould

As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Following information is essential for your better understanding on our moulds

Name: Description
Products' infomation we need to make quotation: Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material: 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc
Mould Base: LKM, HASCO ect.
Cavity: Single/multi
Runner: Hot/cold
Mould Design: 3D/2D Drawing
Design Days: 3 days
Design Software: UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material: PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mould Life: 300, 000-3, 000, 000 shots
Injection System: Pin-point-gate
Polish System: Mirror Polish
Payment: 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time: 15-60days
Specification: Depends on customers requirements.
Business Step 
1. R& D We support customer R& D. Make the files or improve the design if you needed 
↓ ↓ ↓
2. Quotation Making Mould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation  The quality, price, material, delivery time. payment item. ect 
↓ ↓ ↓
4. Mould Design  3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. Mould According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days 
↓ ↓ ↓
6. Mould Testing When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot  If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory 
  ↓ ↓ ↓  
8. Delivery  Delivery goods by sea or by air, according  customers requirementÂ